And...now we're back up to speed...
Here are the last couple "catch up" pictures after being incommunicado for a few weeks.
The living room has been painted (Wedgewood Grey). It really is nice to have the beautiful, clean surfaces that a fresh coat of paint provides. Can I tell you how much my shoulders are killing me from all this edge cutting, wall, and ceiling rolling? On the plus side, only the two bedrooms & bath upstairs have yet to be painted. I'm so totally rewarding myself with a professional massage when I'm done with this mother.
It might be hard to tell from the photos, but this color looks SO different in the living room compared to the MBR - downstairs faces North, so it's a darker, almost teal color. The same thing happens with the Montgomery White in the hallway & library; depending on the light it can go from a buttery cream to POW! Daisy Yellow! Just odd how those things work.Brad put up the beadboard in the downstairs bathroom, after I painted the upper wall (Lambskin). The tile floor was laid today (just in thinset - no grout, yet). He also got a start on the tile surround for the bathtub. Both the tub & floor are going to have a very light grey grout, which he'll probably get on the floor tomorrow. This should set us up to get the cabinets in on Friday.
The other cool thing with the floor is that he put down the subfloor heating mesh, so the tile will stay toasty during the winter (a very nice luxury during our cold Michigan winters!). I'm excited to see how the tub turns out. I found a really pretty chair rail tile to go under the window. Just below that will be a thin green glass tile for an accent. It's very close to the green "depression glass" knobs/handles I got for the cabinets that are going in this room.
You know how sometimes your biggest strength is also your greatest weakness? This project has been so fun because, in the end, everything is the way I want it (or imagine it). At the same time, there's nobody who really says "That is an awful idea. Did you think about how bad that's going to be?" I mean, I have a safety net from family & Brad input. But they're not in on every decision & some things I'm just winging as I go along.
The separate elements are coming together now & I'm really excited to see how it turns out. While the floors are done, they're covered with protective paper & cardboard. So it will be like unwrapping a package when everything else is done...only then will I see it all together!
Wednesday, May 05, 2010 | | 0 Comments
More updates...
Here's more of my progress in the past week:
The whole hallway has been painted. I about "code browned" my pants painting the high part of the hallway. I noted how the drywall guy set up the ladder to get to the high spots & then copied him (ladder leaned up against wall, wedged against stair). He's got bigger balls than I do, though. That was seriously the scariest part of the whole remodel for me. No, the hall is not getting a second coat.
The upstairs master bedroom had been painted navy blue. The second pic shows it after priming, and the third with the new Wedgewood Grey color. The ceiling is Edgecomb Gray - suggested by one of Mom's decorator books for lower ceilings. All my color names are Ben Moore, but the paint is actually Behr from Home Depot - the flat enamel is $17 a gallon compared to $40-something for Ben Moore. And it looks really good/goes on nicely.
My project for this week is stripping and sanding the trim in the kitchen and living room. I'm hoping I can do all the trim sanding in the next couple weeks. Once everything is at least sanded (but not necessarily painted) I can get the ducts cleaned and feel pretty good about moving my things in. I have no idea when the ducts were last cleaned, but they were icky dirty when I moved in - and I've only added to it with the plaster and drywall dust. So the two things that will get done just before moving in will be cleaning the ducts & upstairs carpet.
Wednesday, May 05, 2010 | | 1 Comments
Catching Up...
I fell into a deep, dark hole of painting...and painting...and painting!
Here are a couple of things to catch up.
Dad & Brad put up a fence along the back of my yard - its really nice & Abby is so happy to have a yard to romp around in. I'll have to take an updated picture because those bushes spilling over the top are 100 year old lilacs that are now in full bloom (and smelling delicious). They're also the reason there's a jog in the fence!When I left for a trip to CA, I'd told Matt (the floor guy) I wanted to go w/ the dark stain. Dad called up saying "hold the presses! You should really see how it looks sanded...it looks so open & I'm worried it's going to look like a cave w/ the dark." I'd been hemming, after hearing that the dark floors are a bitch to keep clean. (I mean seriously, I'd love to say I'm one of those people who swiffers the dog fur daily, but realistically, it's lucky if it happens weekly). So I ended up going with the lighter floors - just the natural color (second pic). I'm really happy with it.
I've painted the living room Ben Moore's Alexandria Beige w/ Lambskin colored ceiling.
Brad tetrised the bookshelves into "the library". I mean, seriously, it's like this room was designed for IKEA book shelf dimensions. The corner shelf overlaps the other by a bit less than an inch. Brad designed the bump-out for the upstairs plumbing so that it the shelf under it has one fewer extension unit than the rest of the shelves. I'm kind of wondering if I should paint the bump something closer to the shelf colors, though. (Sorry the pic is so bad, the room is small, so it's hard to find a good angle!)
Wednesday, May 05, 2010 | | 0 Comments
Days 53-54: Bits of Progress
Brad has been hard at work putting up the cabinets in the kitchen. He has the upper and lower cabinets mounted and cut the butcher block countertop on the exterior wall. It's nice when what you imagine comes to fruition!
The big decision today was what floor color to go with. It was funny that all the MEN I asked (with one exception) liked the light, natural look. All the WOMEN (with one exception) liked the dark stain.
I went with the dark stain ;)
One of the girls at work was replacing her patio set and generously offered up her old one - it's so nice to have a nice place to sit outside!
Tuesday, April 13, 2010 | | 0 Comments
Days 51-52: Filling wood floors & more painting
On Saturday Matt (Peckham Floors) brought over the epoxy I'm using to fill the cracks in the wood floor he's going to be refinishing next week.
The wood floors, which we believe to be original to the house (and thus, about 100 yrs old) are pretty thin from previous sandings, and show some cracks and chips, in addition to some significant gaps between the boards.
Filling these with epoxy will make a solid surface, in addition to stabilizing the old boards.
There was a combination of plaster and drywall dust embedded in these cracks that had to be cleaned out before filling it with epoxy. The shop vac didn't do the trick, neither did two types of shop brushes. Some metal brushes I'd originally bought for stripping paint off the moldings did the best job of getting crud out of the cracks.So I literally went over the floors with a fine toothed (metal) comb and brushed out the crud, vacuumed it up, and marked the spot with blue painter's tape.
The next step was filling each crack with epoxy. It came in a caulk-gun type format - though much more expensive per tube than caulk!! I cleaned everything out on Saturday & finished the epoxy on Sunday.
The first choice color for the hallway & library looked like watered down Mountain Dew (BM's Rainforest Dew), so Mom helped me run through some other color choices & I selected Montgomery White. It looks creamy in the hallway, but more yellow in the back library. I cut in and did the first coat in the library today; it went pretty quickly since I didn't have to paint the one wall that will be covered by bookshelves.Pic 1: cleaned & marked cracks.
Pic 2: me at work
Pic 3: filled cracks
Pic 4: freshly painted library
Sunday, April 11, 2010 | Labels: Floors, library | 0 Comments
Mai kitchn haz a colur.
Yeah! I really needed this - finally got some color up in the house this week.
The drywaller was wrapping up the sanding in the other room while I started priming the kitchen and library on Tuesday night. On Wednesday I got both ceilings painted and the first coat of color in the kitchen.
Today (Thursday) Brad got the Allure flooring down - I got the light cork color and it looks really good. I'll get a better (less dusty) picture later.
After work I did the edging and a second coat with the roller. I brought the upper cabinets in so Brad can start into hanging those tomorrow.
Thursday, April 08, 2010 | | 0 Comments
My second job: stripping
I've been at it with the heat gun, stripping the layers of paint off of the woodwork downstairs. Taking all the plaster walls down had the advantage of forcing the removal of all the baseboards...that was extra work in the short term, but will allow me to strip most of the moldings after I've moved in.
Before I get in there, I need to strip the few moldings that are left on the main level. I'm starting with any that touch the wood floor that will be finished in the next 2 weeks.
These first pics are of the living room baseboard moldings. I've stripped the paint and done a first round with the orbital sander on the large/flat area.
The third pic is the newel post on the stairway - it's amazing how much detail there is with the paint removed.
While the drywallers were working late, I finished putting together the kitchen cabinets together. They're just hanging out, waiting to go in!
Monday, April 05, 2010 | | 8 Comments
Days 35-41: I Lurve Drywall
Were I a poet, I would write an ode to Drywall - beautiful, clean, even, drywall.
It makes such a difference to have the walls closed up again.Here are a couple of before and after pics...Taping and mudding the joints is a dirty job - one I'm leaving to the pros. Meanwhile, I've been spending most of my evenings assembling cabinets in the garage.
Once the drywallers are gone, I'll finish stripping the moldings that abut the wood floors that are soon to be finished & prep/paint the kitchen so we can put in the floors and cabinets.
Wednesday, March 31, 2010 | Labels: hallway, living room | 1 Comments
Days 33-34: Insulating & stripping molding
Do you know what makes me a happy girl?
This is about the first time in a month that I haven't been pulling down plaster in my house.
Now I'm into a new past-time: stripping (probably lead) paint.
Yesterday Brad made my house all pretty and girly with new pink insulation in the walls. It's amazing what a noticeable difference this has made already. It's been cold at night here (in the 30's) and then warm during the day (50's) the past couple days. Normally the house temp is pretty much the same as outside, but today the inside was about 15-20 degrees cooler than outside when I visited at lunch. I'm hoping this will keep me toasty this winter & keep down my heating & cooling bills.
In the second pic, you'll see a new design element along the top of the living room wall: some holes for blown in insulation. Dad suggested, and Brad delivered, on putting some blown in insulation in the walls we aren't pulling down.
The drywallers also delivered their boards so they can get started bright & early tomorrow morning.
This evening I started in on stripping the moldings in the living room. I'm hoping to finish stripping them & start on sanding them in the next week...at least before Matt, the wood floor guy (Peckham Wood floors FTW!) starts making the floors pretty. After he's sanded & varnished I won't want to point searing hot power tools anywhere near them, so now's my chance.
The rest of the moldings, which had to be removed in the process of taking off the plaster, are waiting in the garage to be stripped. I'm probably going to hold off on doing those until I've moved in.This last photo shows my progress with the heat gun (about 2 hrs work). You can also see the new outlet Jeff put in for my TV and assorted peripherals. This is going to be a switched outlet so I can reduce the "vampire power" used by all those things sitting in standby mode. I'd like to say I'm green, but really I'm just cheap (and I've got the Dutch genealogy to prove it!)
Wednesday, March 24, 2010 | | 0 Comments
Day 28-33: More of the same
You know how much I complained about pulling down plaster walls?
Plaster ceilings are infinitley worse.
The electrician had to punch a couple holes in the hallway ceiling that I'd originally thought we could plaster over. At a certain point it becomes too much to patch over, so I just pulled it down.
I'm sure there are much dirtier jobs, but this has been the dirtiest I've done to date.
And yes, I probably should have changed my respirator before it got quite that filthy, but I'm glad all that stuff wasn't going into my lungs.
Wednesday, March 24, 2010 | | 0 Comments
Days 25-27: We've got windows!
So I already covered last weekend when I ran down to Detroit to get the first half of my IKEA cabinets.
The people there were really cool and let me leave the other half to be picked up Tuesday when Dad would be down there. My awesome Dad, exhibiting his mad Tetris-skill packing abilities got the rest of it into the Jeep when he was down there. The first two pics are of that mess (which includes a bunch of cabinets, a dishwasher & a microwave). The things my Dad won't do for his girls! (c:
Poor Brad was sick for the first couple days this week, but came back like a champ Wednesday and got the rest of the bathroom plumbing and both the library & bath windows installed yesterday & today.
I meant to go to knitting group on Tuesday evening, but had forgotten my knitting, so that ended up being a night to catch up on laundry & other stuff.
Wednesday I made a run up to the Lowe's in Gaylord to get the extra-long skinny window for the library. It's about 6" shorter than what was there previously, but it will look good. Standing outside, we could tell the current window was in at an angle (like many of the things in this old house). We joked that maybe it was just level with the floor inside...sometimes it's hard to tell what you should make things level with in an old place.
The bathroom window was originally a slider; after all the mold issues in the bathroom I wanted something that wouldn't trap water like the grooves on the slider would.
My original thought was to find an awning style window, but ran into two issues - they were much more expensive and the lead time would have them arriving far after I'd moved into the house.
We ended up getting a solid piece of low-e, Argon filled glass & Brad built a box with an inverted "v" at the bottom so the water will get channeled away from the glass on both the interior & exterior. The box for the glass is made from some sort of vinyl stuff so it won't rot like the old window did.
What I've learned this week: You can shake the new iPods to get it to shuffle to the next song. With the iPod in your pocket, you can get the iPod to shuffle by dancing (badly). This method of advancing the track is superior to setting down tools & removing gloves to hit fast-forward.
Pics 1 & 2: Dad's packing job.
Pic 3: Bathroom window & framing for shower/tub faucets
Pic 4: Newly installed bathroom window.
Thursday, March 18, 2010 | Labels: Bath (down), kitchen, library | 0 Comments
Day 23-24: Wave of Mutiliation
Guess what I did yesterday and today? If you guessed "pull down plaster" you get a gold star!
Here's why I wear a respirator. Some of the stuff falling out of the walls is nasty.
You know that part of human nature where the thing you tell yourself NOT to think about is the only thing you can think about?
That's what happened today as I'm ripping down lathe & getting rained on with crap. "Hmmm...wonder what's in these walls." Mice, mouse droppings, bugs, bug droppings. Just try to not think about it. It's the grey/black clumps of hair that creep me out the most - I'm just hoping its the horse hair binder they used in the plaster and not something else. bleh.
These wall pics are from Sunday night. I finished pulling down lathe in the dining room exterior wall. The other walls will just have drywall over the lathe.A bit of Sunday & all of today were devoted to the front hallway. The pic, taken Sunday, shows the plaster down in a section. I actually have this corner down to the studs with what I did after work. I left around quarter of 9 & it was too dark to take a good pic.
I'm about ready for another trip to the dump.
Pic 1: 1 day's breathing in left mask vs. new one.
Pic 2: Living room down to the studs
Pic 3: Starting the plaster/lathe removal in the hallway.
Pic 4: Trailer 'o junk
Monday, March 15, 2010 | Labels: hallway, House, living room | 0 Comments
Day 22: Fun at IKEA
Fraud services from my credit card called while I was at IKEA. Going from not using it in a year or so, to making a run to Home Depot & then a much pricier purchase at IKEA they were concerned. Isn't that sweet?
I did the run on Saturday morning, arriving a bit before they opened. I was really lucky with the timing of my remodel and hit one of their semi-annual kitchen sales. I ended up cancelling the micro-hood I'd ordered from Sears because the extra 5% off with buying the microwave/hood vent AND dishwasher from IKEA made the dishwasher essentially free. Free is good! Though not cheap, the whole shebang from IKEA (cabinets, countertops & fire clay sink, microhood & dishwasher came in a smidge over $3K. Not too shabby.
The girl I worked with in their kitchen department was really good and I was pleasantly surprised with how fast they were able to pull my order together. I'd heard it could take several hours, but they were done in less than one. (Far before I was done doing other shopping!) I also lucked out that every.single.thing. on my list was in stock: another area I'd heard could be a trouble spot. It took me about an hour to check through all the carts to make sure everything was there before the guys loaded a good chunk of it into my car.
I probably over-stuffed my car, but I was able to get more than half the kitchen in the Waggin' Vagon. Dad is picking up the rest this week while he's on a business trip to Detroit.
Hmmm...now to put it all together!
Monday, March 15, 2010 | | 0 Comments
- House
- cirque
- mystery
- Beatrix
- Feast
- hallway
- life
- kitchen
- living room
- Gentle St. Nick
- Splendor IX
- finishes
- library
- Bath (down)
- ornies
- stash
- Random thoughts
- SBQ
- brightneedle
- goals
- new
- organization
- After pics
- Floors
- Hornbook
- adia
- books
- claudia mittens
- dining
- front yard
- knitting
- memes
- smoke ring
- stairs
- sweater
- winter
- woodland walk
